The first job after the boiler was lifted from the MR well wagon, which
had been its temporary home for the last six months, was to re-unite
the boiler and the ashpan. Eric Riley, in the red overalls, watches
as the 75 Ton crane slowly slews the boiler into position over the ashpan.