| Click on a Picture to See the Full Size Version - Click 'Back' to Return |
 |
1. The Carriage and Wagon shed at Butterley c1973 |
|
2. Laying the track for Butterley Yard. c1973 |
 |
 |
3. Laying track at Hammersmith. Looking West before the A38 was constructed. c1973 |
|
4. The foundation for Butterley Station building c1978 |
 |
 |
5. Site preparation for the Road Transport Museum at Swanwick. May 1985 |
|
6. New Signal Box (since replaced) on Brands sidings with the museum in the background. March 1986 |
 |
 |
7. Fitting the interlocking in the ex Ais Gill Signal Box at Butterley. Sept 1986 |
|
8. Installing the Kilby Bridge signal box at Hammersmith in March 1987 |
 |
 |
9. The reconstruction of St Mary's Gatehouse by the gates at Swanwick. July 1987 |
|
10. Inside 'C' bay in the museum on December 18th 1987. Locos 'on shed' were 44932, 53809, 68012, Sentinel, 47537 and diesel 45017. |
 |
 |
11. Laying track on the Garden Railway at Butterley. June 10th 1990 |
|
12. Publicity Shot featuring 4-2-2 Johnson Spinner 673, now in the National Railway Museum at York |
 |